EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Acts to Ensure Key Coal-fired Power Plants Are Available in MISO to Supply Peak Summer Demands

LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.

Read more

EPA Announces Proposed Rule Action to Revise ELG's and Support Reliable, Affordable Coal-fired Power Plants

LCG, May 14, 2026--The U.S. Environmental Protection Agency (EPA) announced today that it is proposing a rule to revise wastewater limits, known as effluent limitations guidelines (ELG), for steam electric power plants that will help improve grid reliability and lower electricity prices while continuing to support clean and safe water resources. If finalized, the EPA's proposal is estimated to reduce electricity generation costs by as much as $1.1 billion annually, which could provide cost-savings to American consumers.

Read more

LCG NEWS

LCG Unveils 2nd Edition of 2025 ERCOT Electricity Market Outlook (3/20/2025)

LCG, March 20, 2025 – LCG Consulting (LCG) has released a second edition of its annual outlook of the ERCOT wholesale electricity market for 2025, highlighting the region's rapid transition toward increased reliance on renewable energy resources and battery storage.
Read more

Previous LCG News

LCG Unveils 2nd Edition of 2025 ERCOT Electricity Market Outlook (3/20/2025)
LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT) (10/10/2023)
As Texas Wind and Solar Capacity Increase, Energy Curtailments are also likely to Rise (7/13/2023)
LCG 2023 Annual Outlook for Texas Electricity Market (See updated Outlook here) (7/11/2022)
LCG Publishes 2022 Annual Outlook for Texas Electricity Market (ERCOT) (2/8/2022)
NorthRenew Energy's Mesquite Sky Wind Project Commences Construction (1/26/2021)
Tokyo-based Electric Power Subsidiary partners with AP Solar in 400 MW Texas Solar Project (8/6/2020)
Texas Solar Project Sold to CIP (7/31/2020)
NorthRenew Energy achieved financial close for TG East Wind Project (6/18/2020)
ERCOT reviewed Frio County Transmission Project (6/18/2020)
Top
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service