News
LCG, June 4, 2025--Energy Vault Holdings Inc. (Energy Vault) and Jupiter Power (Jupiter) today announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. The initial BESS project, located near Fort Stockton, Texas, was completed in July 2024, with a storage capacity 100 MW/200 MWh. The new BESS project will add another 100 MW/200 MWh of capacity. Construction has commenced, and the project is expected to achieve commercial operations by the end of this summer.
Read more
|
LCG, May 30, 2025--NuScale Power Corporation (NuScale), a leading provider of advanced small modular reactor (SMR) nuclear technology, yesterday announced that it has received design approval from the U.S. Nuclear Regulatory Commission (NRC) for its uprated 77 MW power modules. NuScale states that it remains the only SMR technology company with design approval from the NRC, and the company remains on track for deployment by 2030, with 50- and 77-MW SMR options.
Read more
|
|
|
Industry News
SDG&E Selects Mitsubishi Power's Emerald Storage Solution for New Storage System
LCG, March 18, 2022--San Diego Gas & Electric Company (SDG&E) has awarded Mitsubishi Power an order for a 10 MW / 60 MWh battery energy storage system (BESS) for its Pala-Gomez Creek Energy Storage Project in Pala, California. The project will add capacity to help meet high energy demands, support grid reliability and operational flexibility, maximize use of renewable energy, and help prevent outages during peak demand.
SDG&E’s Director of Advanced Clean Technology stated, “SDG&E is committed to achieving net-zero greenhouse gas emissions by 2045. We are increasing our portfolio of energy storage assets to reach this goal. These assets enhance grid reliability and operational flexibility while maximizing our use of abundant renewable energy sources in California.”
Mitsubishi Power’s Emerald storage solution for SDG&E includes full turnkey design, engineering, procurement, and construction, plus a 10-year, long-term service agreement. The project is scheduled to be online in early 2023.
The BESS solution will repower an existing energy storage site. The design includes lithium iron phosphate (LFP) battery chemistry for added physical safety. The storage solution will include Mitsubishi Power’s Emerald Integrated Plant Controller, which is an Energy Management System (EMS) and Supervisory Control and Data Acquisition (SCADA) system with real-time BESS operation and a monitoring/supervisory control platform.
Mitsubishi Power Americas’ Senior Vice President, Energy Storage Solutions, stated, “As more and more renewables come online during the energy transition, BESS solutions are essential to support a reliable and stable grid. We look forward to providing SDG&E with our BESS solution to add capacity, energy, and ancillary services to California’s grid. Mitsubishi Power’s Emerald storage solutions are enabling a smarter and more resilient energy future for our customers in California and around the globe.”
The BESS project is Mitsubishi Power’s eighth in California and will increase the total capacity to 280 MW / 1,140 MWh of storage to help meet California’s clean energy goals.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|