News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Enel Green Power Moves Forward with Installing More Renewable and Storage Capacity in Texas
LCG, July 22, 2022--Enel Green Power announced Wednesday the completion of hybrid wind project, Azure Sky Wind + Storage, and the installation of new battery energy storage systems at the operating Roadrunner and High Lonesome renewable project sites. Through these projects in Texas, Enel Green Power continues its renewables + storage expansion with 350 MW in new generation capacity and 251 MW/376 MWh of battery storage.
The head of Enel Green Power in the US and Canada stated, “We're committed to connecting Texans with clean and cost-effective electricity through our renewable projects. The Azure Sky Wind + Storage project and storage additions at Roadrunner and High Lonesome help to add measurable value in the form of storage capacity and reliability to support the state's electricity system. Enel Green Power's projects provide more generation, more resource diversity, and more dispatchable storage – three key elements of Texas's goal to reform its power grid.”
Azure Sky Wind + Storage is Enel Green Power's first large-scale hybrid wind project globally. The project, located in Throckmorton County, includes a 350 MW wind facility and a battery energy storage system (BESS) rated at 137 MW/205 MWh. Enel Green Power signed an aggregated power purchase agreement (PPA) with corporate partners Akamai, MilliporeSigma, Synopsys and Uber. Kellogg Company, HP Hood and lululemon also signed PPAs to purchase clean energy output.
Enel has added grid-connected battery systems at the Roadrunner Solar and High Lonesome Wind projects. Each battery system adds 57 MW/86 MWh of storage capacity to the grid, supporting grid reliability in a state often experiencing high demand from elevated temperatures and extreme weather. The storage systems also help balance intermittent generation from the renewables-saturated western region of ERCOT. With a total of 170 MWh of energy storage capacity between the two projects, Enel can dispatch flexible capacity, providing services to support resiliency amid shifting grid conditions in ERCOT. Enel plans to operate a portfolio of 12 battery energy storage systems able to store over 1,290 MWh in Texas by early 2023.
Enel is pursuing an aggressive growth strategy n the US and Canada, with plans to add 6.5 GW of new renewable generation and 2,600 MWh of storage capacity by the end of 2024.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|