EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

Construction Celebration at Arevon Energy's 300 MW/1,200 MWh Nighthawk Energy Storage Project in California

LCG, July 31, 2025--Arevon Energy, Inc. today announced a milestone celebration event for the construction proceedings at its Nighthawk Energy Storage Project in Poway, California. The $600 million Nighthawk Energy Storage Project, with a design capacity of 300 MW/1,200 MWh, will use modern lithium iron phosphate batteries. The project will be built by Rosendin. Arevon developed the project and will own and operate the facility.

Arevon signed a long-term contract back in 2021 under which the Nighthawk Energy Storage Project will provide energy and resource adequacy to Pacific Gas and Electric Company (PG&E). The project will connect to the grid at the Sycamore Canyon Substation located on the Marine Corps Air Station (MCAS) Miramar, which distributes energy to the greater San Diego area.

"What sets the Nighthawk Energy Storage Project apart is Arevon's years of experience and proven track record in successfully developing safe, reliable renewable energy and battery storage projects in California and throughout the United States as well as the project's design, which includes added safety measures and will comprise the safest and most advanced batteries on the market today. In addition, Arevon has partnered with the Poway Fire Department, who is committed to protecting the community, first responders, and the facility in the unlikely event an incident occurs," said Arevon's Chief Executive Officer at Arevon. "Battery storage is the way of the future, and Arevon is pleased to bring this essential energy solution to Poway, where we are committed to being a great community partner through the project's multi-decade life."
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service