EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Reliant Plans Big West Texas Wind ‘Ranch’

LCG, Aug. 25, 2000--Reliant Energy Inc. yesterday announced it had formed a new renewables subsidiary that will produce electricity from wind power and landfill gases. The new company, Reliant Energy Renewables Inc., will enable the company to comply with provisions of the Texas electric restructuring law that takes effect in 2002.

Reliant said the new unit would build just about the worlds largest wind farm on a mountain in West Texas, except the company called it a "wind ranch." It will also place gas turbines at 12 existing landfill sites in Texas.

The wind farm will be a whopper, even by Texas standards. At 200 megawatts, it will be the largest in the world in terms of capacity and will use some of the largest wind turbines developed to date. About 160 of the largest yet manufactured, each producing 1,300 kilowatts when the wind is just right, will be placed on King Mountain outside of McCarney which is due south of Odessa.

Reliant didnt say how big the wind ranch would be in terms of acres, but its doubtful that as many as eight of the windmills could be placed on a square mile of level land. It looks like the installation will cover at least 20 square miles, and possibly a lot more.

"This is a Texas-sized commitment by Reliant Energy to diversify its electricity supply portfolio withpollution-free renewable energy," said Ian Mays, president of Renewable Energy Systems, one of the companys that will develop the wind ranch. Reliant will purchase the power for resale.

Reliant's landfill gas-to-electricity project, which will extract methane gas that occurs naturallyin landfills as materials decompose, will produce a total of 44 megawatts of power. According to Jeff Ferguson, director of special projects for Reliants wholesale group, "The methane will be collected from shallow wells that will be drilled into each landfill. The gas will then enter a closed pipeline system connecting to reciprocating engines. The methane will fuel the engines, which, in turn, will generate electricity."

Landfills included in the project are the Atascocita landfill at Humble and the Blue Bonnet landfill inHouston. Others are located at Alvin, Security, Conroe, New Braunfels, Hutto, Temple, Waco, Sherman, Kingston, and Fort Worth. All are operated by Waste Management Inc., of Houston.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service