EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

San Jose Merchant Plant Recommended by California Panel

LCG, Oct. 12, 2000A siting committee of the California energy Commission has recommended approval of the Metcalf Energy Center power plant that Calpine Corp. and Bechtel Enterprises Inc. want to build in an industrial section of San Jose.

The panel voiced misgivings about the project, chiefly because of its proximity to residential areas, but concluded that its benefits "would be substantial." The approval was granted because the plant "would enhance the reliability of an imperiled electric system."

The plant will, if it gains final approval from the Energy Commission and the City of San Jose, be built on a 20 acre site in an area that has, because of low land values, been developed for low cost housing.

Because of its proximity to residential areas, San Jose Mayor Ron Gonzales and others have opposed construction of the plant.

San Jose bills itself as the "Capital of Silicon Valley." Recent estimates place the growth of electricity demand in Silicon Valley at 10 megawatts per day. That means Silicon Valley will need a new power plant the size of the Metcalf Energy Center every two months.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service