News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Reliant Plans 500 Megawatt Plant for Nevada
LCG, Oct. 19, 2000--Reliant energy Inc. said yesterday that its Reliant Energy Power Generation Inc. subsidiary will build a 500 megawatt merchant power plant about 20 miles north of Las Vegas, Nev. It will be Reliant's second facility in the Las Vegas area.The natural gas-fired, combined-cycle Arrow Canyon project will be located in a canyon on a portion of private land owned by Republic Services of Southern Nevada Inc., which operates a 1,200-acre landfill at the site. Republic Services will lease a small parcel of land near the landfill to Reliant Energy for this project.According to J. Douglas Divine, senior vice president for generation development with Reliant's wholesale group, the plant will be air-cooled, using the smallest possible volumes of water. The company said it will contract with Republic Services for what water it does need under an existing water allocation.Joe Bob Perkins, president and chief operating officer of Reliant Energy Wholesale Group, said Arrow Canyon would provide power to Las Vegas, "one of the fastest growing communities in the U.S."Reliant and a partner jointly own and operate El Dorado Energy, a 480 megawatt facility southeast of Las Vegas, near Boulder City. That natural gas-fired plant began commercial operation earlier this year.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|