EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

Czech, Austrian Chiefs To Meet About Temelin

LCG, Oct. 19, 2000--Prime Minister Milos Zeman of the Czech Republic and Austria's Chancellor Wolfgang Schssel plan to meet October 31 in Brno, southeast of Prague, to discuss the Czech nuclear power plant at Temelin.

The Temelin plant, strongly opposed by Austria which is a national "nuclear free zone," began its start-up process last week when it "went critical" with its first nuclear chain reaction. It is expected to take several months to reach full capacity and begin commercial operation.

Shortly after the meeting between Zeman and Schssel was announced, the Austrian parliament passed a resolution calling for Schssel to do what he can to prevent Temelin from being placed on-line. The Czechs, bedeviled for the past few weeks by Austrian protesters blockading border crossings, are unlikely to be deterred by Austrian resolutions.

In fact, Czech Foreign Minister Jan Kavan said Prague set as a precondition for the October 31 meeting the cessation of all disruptions along the Czech-Austria border.

Kavan, speaking at a news conference following talks in Brussels with the European Union's "enlargement" commissioner Guenther Verheugen, said if there were any more blockades there would be no meeting.

The Brussels meeting was called by Verheugen in part because interruption of traffic between member nations is banned by the EU, including traffic between members and applicant nations, and in part because Schssel has repeatedly threatened to block the Czech application for membership in the EU if Prague did not accede to Austrian demands that Temelin be abandoned.

According to Radio Prague, Verheugen said that border blockades neither boosted dialogue nor benefited the free movement of goods.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service