News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Mirant Plans 894 Megawatts for Wisconsin
LCG, March 16, 2001--Mirant Corp. said this morning it plans to build an 894 megawatt natural gas-fueled merchant power plant near the town of Plover, Wisc., about 30 miles south of Wausau."The proposed Portage County plant would serve the central Wisconsin area and have access to regionally interconnected power pools in all or part of 12 Midwest states and central Canadianprovinces," explained Richard J. Pershing, president of Mirant Americas.Two units of the plant, with a combined capacity of 586 megawatts, would be configured for combined cycle operation as a baseload facility while four others, totaling 308 megawatts of output, would be simple cycle turbines operated as peaking units. The power plant is expected to be built on 54 acres of land in an industrial corridor. Assuming timely completion of appropriate state and local permitting, Mirant plans to have the power plant working by 2003.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|