EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

NRC Asked to Extend Licenses for Peach Bottom Nukes

LCG, July 3, 2001Exelon Corp. said yesterday its Exelon Nuclear subsidiary had filed applications with the Nuclear Regulatory Commission asking that the operating licenses of Units 2 and 3 of the Peach Bottom Atomic Power Station near Lancaster, Pa. be extended for 20 years.

"A 20-year extension in Peach Bottom's operating license is an investment in 2,200 megawatts of clean, emission-free electricity and helps to ensure an economical and reliable source of power for southeastern Pennsylvania for years to come," said Oliver D. Kingsley, president of Exelon Nuclear.

Exelon said its license renewal team has reviewed more than 100 systems and inspected more than 40,000 items of plant equipment to determine that the two reactors will be able to continue operation without risk to public safety or health. In a nutshell, the company said the plants are better than new because of stringent maintenance requirements and continued improvement in operations.

Last year, the Peach Bottom plant generated the most electricity in its 25-year history, Exelon said.

Exelon pointed out that the license renewal will cost about $18 million for both reactors, or around $8 per kilowatt of capacity. By comparison, building a new natural gas-fueled power plant can cost anywhere from $500 to $1,000 per kilowatt of capacity, the company said.

Exelon and Public Service Enterprise Group Inc. each have a 46.25 percent ownership interest in Peach Bottom, with Conectiv Inc. owning the 7.5 percent balance.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service