EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

In Memory of Rajat Deb: Inspiring Man of Ideas and Remarkable Silicon Valley Archetype

By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.

Read more

Oklo and Centrus Sign Letter of Intent to Purchase Nuclear Fuel for Aurora Powerhouse Deployment in Southern Ohio

LCG, June 19, 2026--Oklo Inc. and Centrus Energy Corp. announced yesterday a Letter of Intent under which Centrus agrees to supply enough domestic high-assay low-enriched uranium (HALEU) to power up to five of Oklo's Aurora nuclear powerhouses for multiple years, with deliveries to Oklo scheduled to begin in 2029. Centrus will supply HALEU from its American Centrifuge Plant in Pike County, Ohio to support Oklo’s planned 1.2 GW power campus in the region

Read more

Industry News

SDG&E Supports San Diego Transmission Link

LCG, Oct. 8, 2001--San Diego Gas & Electric Co. on Friday filed with the California Public Utilities Commission testimony strongly backing construction of its proposed $271 million, 31-mile Valley-Rainbow Interconnect transmission power-line.

The line, which could be completed by 2005, would link SDG&E's system at Rainbow and the Southern California Edison Co. system in Romoland.

"Whether or not new power plants are built in the region, the construction of the proposed project remains critical to the state's future electric reliability," SDG&E said in a statement.

"Due to the ever-changing landscape of the state's electric picture, we decided to test the need for the 500,000-volt Valley-Rainbow Interconnect by carefully exploring several different scenarios involving the need for the line," said James P. Avery, senior vice president of fuel and power operations for SDG&E.

"In each case, the common conclusion was that this project is required in 2005 and grows in importance every year thereafter. In our view, SDG&E's CPUC-mandated obligation to serve its customers with a reliable source of energy must involve the construction of this project."

Once completed, the Valley-Rainbow Interconnect could connect the state's sources of power with a pathway that can accommodate as much as 1,000 megawatts.

"Providing an enhanced electric pathway linking power sources to the north and south should help put downward pressure on electric costs by enhancing competition while bolstering reliability for all electricity users in the region," Avery said.

In the event that Southern California Edison's existing 500 kilovolt transmission system is interrupted, the Valley-Rainbow Interconnect would serve as an emergency backup for southwest Riverside County, Avery added.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service