EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Frisco Votes Today on Forming Municipal Utility

LCG, Nov. 6, 2001--Voters in San Francisco will decide today whether to form a municipal utility, a move that would involve leaving the pacific Gas & Electric Co. system and taking the utility's distribution network through eminent domain.

Two measures on today's ballot have the backing of Democrats and other liberals -- and there is hardly anything else in San Francisco. One initiative is confined to the city of San Francisco while the other includes the small town of Brisbane, on its southern border.

Angela Alioto, a Democrat, daughter of a former San Francisco mayor and a former San Francisco supervisor herself, is legal counsel for the Municipal Utility District campaign. "There is no question that public power gives the consumer a lower utility bill," she says.

PG&E Corp., parent company of the utility, is fighting the measures, and points out that seizing the distribution system wouldn't provide the power to send through the wires. "You're taking on a huge responsibility without any benefit because buying the system doesn't give you any more power, it just changes the ownership," said Jon Kaufman, a spokesman.

Opposition by PG&E is just one more reason to vote for one or both of the measures, say backers who contend that it is "unconscionable" for the utility, which is mired in bankruptcy proceedings, to spend money owed to its creditors on fighting the initiatives.

PG&E spokeswoman Jennifer Ramp counters "It's only prudent for any company to fight measures that seek a hostile takeover of (its) assets."

San Francisco already owns substantial electricity generation assets -- the city's Hetch Hetchy Water & Power system has three dams in the Sierra Nevada Mountains that have a combined capacity 334.5 megawatts, about a third of the combined needs of San Francisco and Brisbane.

Hetch Hetchy power, however, has been sold under long-term contracts that would have to be abrogated if the electricity was to be used by San Francisco.

No matter what the voters decide today, nothing much is likely to happen for a long time -- PG&E is an old hand at fighting municipalization. It took the city of Sacramento more than 20 years of court battles to finally break away from the utility.

"If these measure pass, nothing's going to change overnight," Kaufman said.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service