News
LCG, June 4, 2025--Energy Vault Holdings Inc. (Energy Vault) and Jupiter Power (Jupiter) today announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. The initial BESS project, located near Fort Stockton, Texas, was completed in July 2024, with a storage capacity 100 MW/200 MWh. The new BESS project will add another 100 MW/200 MWh of capacity. Construction has commenced, and the project is expected to achieve commercial operations by the end of this summer.
Read more
|
LCG, May 30, 2025--NuScale Power Corporation (NuScale), a leading provider of advanced small modular reactor (SMR) nuclear technology, yesterday announced that it has received design approval from the U.S. Nuclear Regulatory Commission (NRC) for its uprated 77 MW power modules. NuScale states that it remains the only SMR technology company with design approval from the NRC, and the company remains on track for deployment by 2030, with 50- and 77-MW SMR options.
Read more
|
|
|
Industry News
Nevada Power's $961 Million Rate Hike Not Half Enough;Casino Operators Balk at Prospect of $1 . Billion More
LCG, Dec. 28, 2001--Nevada Power Co., which has asked state utility regulators for a whopping $961 million (as in $0.96 billion) rate increase could be back asking for another rate hike of about $1 billion a year from now, the Las Vegas Review-Journal reported yesterday.Casino operators, who are pretty good on figuring the odds, think it could happen and are unhappy about it.The Nevada Energy Buyers Network, which represents casinos and other commercial customers, questioned the way Nevada Power based part of its proposed rates on future costs. The utility has based those costs on prices in contracts for wholesale power it either can't or chooses not to generate itself.Nevada Power is confident it can renegotiate contracts with wholesale power providers so that it will pay less than the contract terms. Based on those assumed renegotiations, Nevada Power projects that its "going forward" cost should be 5.4 cents per kilowatt hour. But other utility documents show the rate should be 11.8 percent per kilowatt hour, the paper said. The difference between the two is about $1.05 billion in annual revenue for Nevada Power.Steve Boss, president of the buyer's network, said "The magnitude of the increase is a substantial financial impact on our clients, and our clients want to make sure in fact that the costs were prudently incurred as required (under state law)."
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|