EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Solar Project Will Serve 400,000 in Rural Philippines

LCG, Feb. 7, 2002--A rural section of the Philippines' island province of Mindanao is a party to an agreement with Spain and BP Solar for the installation of solar power for lighting and water systems in a remote, undeveloped area.

Spain will provide 2.4 billion pesos ($48 million) of aid for the project, coordinated by Agrarian Reform Secretary Hernani Braganza. Approximately one-third of the country's poor live in Mindanao. The project is seen as a more cost-effective way to provide power than connecting the area to the main National Power Corp. transmission network and transporting fuel for local generators.

The first of two phases in the installation process will begin in September, and will provide lighting to 5,500 families. Later, 25 irrigation systems and 97 systems to process and distribute drinking water will be installed. Eventually, 68 schools and community centers and 79 health clinics will be electrified. The second phase will also provide lighting for an additional 9,500 homes.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service