News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Hog Bayou Energy Center Online in Mobile, Alabama
LCG, Feb. 11, 2002--Following startup and testing procedures, the Hog Bayou Energy Center, in Mobile, Ala., began operations today.Owners Calpine Corporation and InterGen, a Boston energy firm, say the 245-megawatt power plant is the first of Calpine's plants to go online in the Southeast.Calpine has three projects now under construction in other parts of the state. Two of those are the Decatur Energy Center, 794 megawatts, and the Morgan Energy Center, 790 megawatts, both of which are in Decatur. The Hillabee Energy Center, on which work continues in Tallapoosa County, will be rated at 770 megawatts.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|