|
News
|
LCG, January 13, 2026--Oglethorpe Power today announced it has selected Kiewit Corporation through its subsidiary, The Industrial Company (TIC), as the Engineering, Procurement and Construction (EPC) partner for its new combined-cycle (CC), natural gas-fired power plant in Monroe County, Georgia. The new, 1,425-MW facility represents a capital investment of more than $3 billion. Commercial operation of the new generation capacity is planned to commence in 2029.
Read more
|
|
LCG, January 9, 2026--Meta today announced new, landmark agreements that will (i) extend and expand the operation of three existing nuclear power plants and (ii) drive the development of advanced nuclear technology. Meta's new agreements with Vistra, TerraPower, and Oklo follow Meta's request for proposals (RFP) issued last month. Meta expects these projects to deliver up to 6.6 GW of new and existing clean nuclear energy by 2035.
Read more
|
|
|
Industry News
Signs Good for California Summer Power Supply
LCG, Apr. 9, 2002--New power plants, better hydro conditions and continued conservation should allow Californians to worry less about rolling blackouts during the coming summer, according to the California Energy Commission.The commission will release a report later this month that describes a power supply situation much improved from that of last year. In 2001, hydro reservoirs were at low levels throughout the Western U.S., and a number of planned power plants were either in the permitting process or still under construction. For now, the executive director of the CEC, Steve Larson, says "summer looks pretty good."One reaction to 2001's power crisis seems to be a lingering commitment to lower power usage by consumers. A survey conducted by the Sacramento Municipal Utility District led it to predict that half of the reduction in consumption that took place last year will be permanent. This is approximately the amount of conservation needed to pull through even an unusually hot summer. Larson was quoted in the Sacramento Bee: "I think the commitment is so strong in the state not to have blackouts that we won't have blackouts."The Independent System Operator, operator of the California grid, is looking to enroll participants in a "negawatt" program, which would allow the ISO to reduce demand by up to 500 megawatts when needed in return for payments or price incentives. SMUD is one utility that has a similar program in place.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|