EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

Duke Energy North America Plans Three Merchant Plants

LCG, Jan. 14, 2002--Duke Energy North America has signed contracts with Duke/Fluor Daniel to design and construct three merchant generating plants worth a total of 2,420 megawatts of new capacity.

Jeff Faulk, president and chief executive officer of Duke/Fluor Daniel noted, "This brings our portfolio of active EPC projects to more than 16,000 megawatts of fossil-fueled power generation." The plants will be located in three disparate areas within the western states. The Luna Energy Facility will be located in Luna County N.M., and will have a nameplate capacity of 600 megawatts. In Grays Harbor County, Wash., the 620-megawatt Grays Harbor Energy Facility is planned. Moapa County, Nev., will be home to the 1,200-megawatt Moapa Energy Facility.

Each of the power plants will be a combined-cycle facility, fired by natural gas. Commercial operation of the plants, which will utilize eight General Electric-7FA combustion turbines, is expected starting in the summer of 2003.

Jim Donnell, president and chief executive officer of DENA commented that with Duke/Fluor Daniel's record, he believed that "these facilities will be providing competitively priced power to the western United States when demand peaks in the summer."

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service