EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

Nevada Power Tries to Make Rates More Manageable

LCG, March 25, 2002-Nevada Power produced a new plan to reduce the effect of the $922 million rate increase its customers will be saddled with.

On Friday the Nevada generator presented an adjustment to its previous three year plan to increase rates by 21 percent. The new plan increases rates by 8.8 percent over six years instead.

Basic economics says that this results in higher costs because customers would have to deal with interest over more periods.

State Consumer Advocate Tim Hay says he may appeal the rate case if the Nevada Public Utilities Commission does not reduce rates.

However, according to the Las Vegas Review, Nevada Power chief executive Walt Higgins said that the plan offered hope in the face of rate increases and future power shortages.

The $922 million was spent last year purchasing wholesale power and fuel.

According to Higgins, Nevada Power's plan is made possible by an agreement with Reliant Energy and Williams Cos. High- and low-cost power contracts could then be mixed according to "blend and extend" agreements.

In addition, Nevada Power will buy power from Williams and promptly sell it back to Williams at a profit. At the end of a specified period, Williams would then purchase power from Nevada Power and sell it back at a profit.

Many in the state, such as state Senator Randolph Townsend (R ), still oppose the rate increase, citing state law that only allows for rate increases for practical expenditures.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service