News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Duke Energy to Build 1240 MW Ohio Plant
LCG, April 16, 2002-Duke Energy North America has just contracted Duke/Fluor Daniel to engineer a 1,240 MW Natural Gas plant in Ohio.The plant, which will operate in a combined-cycle configuration, is scheduled to be in service summer 2003 and will be located at the Hanging Rock Facility in Lawrence County, Ohio. Houston-based Duke Energy North America currently owns over 7,000 MW capacity and has over 10,000 MW scheduled for operation by summer next year.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|