|
News
|
LCG, October 6, 2026--Google and Constellation Energy today announced a long-term strategic clean energy collaboration to bring 890 MW of new, reliable, carbon-free nuclear capacity onto the PJM Interconnection grid to meet growing demand and increase grid reliability. The first uprate is expected to be delivered by 2028.
Read more
|
|
LCG, October 5, 2026--The U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF) today announced a conditional loan commitment of up to $4.2 billion to finance nuclear uprates and modernization across Vistra’s nuclear fleet in Pennsylvania and Ohio. The projects are expected to preserve nearly 4 GW of carbon-free, baseload power and add 433 MW of new nuclear capacity that will support the growing electricity demand across the PJM region.
Read more
|
|
|
Industry News
Gas Pipeline Connects Russia and Turkey
LCG, June 4, 2002--The $2.3 billion Blue Stream project, a gas pipeline from Russia to Turkey, has been completed and is ready for testing.Eni SpA, an Italian oil and gas company, installed the pipeline in the Russian part of the Black Sea and says that the testing for both of the two lines created in the project will be completed by the end of the year.The pipeline will annually move 16 billion cubic meters of gas from Russia to Turkey. The 24-inch diameter pipelines span 239 miles (384 kilometers) and are at an underwater depth of up to 2,150 meters.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|