News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
830 MW Texas Combined-Cycle in Operation
LCG, June 5, 2002--Calpine Corporation, based in San Jose, California, announced that its 830 MW Baytown Energy Center has entered into combined-cycle operations.The Texas facility, located in Baytown, generates 700 MW under base load and can provide 130 MW additional capacity when demand increases.The company says its plant results in 96 percent less nitrogen oxide emission, 99 percent less sulfur dioxide emission, and half as much carbon dioxide emission than the Texas average for power plants.Calpine has a twenty-year contract with chemical company Bayer to provide electricity and steam from the Baytown plant.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|