EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Energy Vault and Jupiter Power Announce New Agreement for Battery Energy Storage System in Texas

LCG, June 4, 2025--Energy Vault Holdings Inc. (Energy Vault) and Jupiter Power (Jupiter) today announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. The initial BESS project, located near Fort Stockton, Texas, was completed in July 2024, with a storage capacity 100 MW/200 MWh. The new BESS project will add another 100 MW/200 MWh of capacity. Construction has commenced, and the project is expected to achieve commercial operations by the end of this summer.

Read more

NuScale Power Achieves Standard Design Approval from NRC for 77 MW SMR

LCG, May 30, 2025--NuScale Power Corporation (NuScale), a leading provider of advanced small modular reactor (SMR) nuclear technology, yesterday announced that it has received design approval from the U.S. Nuclear Regulatory Commission (NRC) for its uprated 77 MW power modules. NuScale states that it remains the only SMR technology company with design approval from the NRC, and the company remains on track for deployment by 2030, with 50- and 77-MW SMR options.

Read more

Industry News

Transactions by Enron Made Through Small Utilities

LCG, June 6, 2002--In testimony before California state senators yesterday, consultant Robert McCullough, of Portland, Oregon, said that Enron used trades with members of the Northern California Power Agency to evade regulatory detection of manipulative trading strategies.

McCullough said the NCPA was only one of various trading partners used by Enron to create the illusion of impending congestion on the California transmission grid. The agency's members include 23 public utilities, many of which rely on the NCPA for electric power services. "All told, Enron's schemes included a number of other parties, selected for their transmission access, location and ability to obscure regulatory review," McCullough told a panel investigating the blackouts that took place in 2001. The Independent System Operator ordered rolling blackouts of different areas of the state in order to prevent a system-wide collapse.

John Fistolera, the NCPA's legislative director, said, "As far as we knew, the movement of generation over those lines was to the benefit of the statewide grid." A sales division manager, Larry Owens of Silicon Valley Power, based in Santa Clara, said Silicon Valley Power had not utilized the wholesale services provided by the NCPA. Palo Alto's spokeswoman, Linda Clerkson, said the municipal utility had no comment, when contacted by the Sacramento Bee.

The appearance of congestion could have been used to the advantage of traders, because of a rule imposed by the Federal Energy Regulatory Commission that required payments to energy providers for not loading lines with their generation. The ISO asked that the rule be dropped.

"The schemes appear to be simple comercial fraud since, by design, no actual generation was ever envisaged as running to support the schedules filed with the ISO. Stripped of their complexities, these schemes are simply a modern form of check kiting," McCullough testified. The ISO, which would receive allegedly fraudulent schedules of generation and demand, would attempt to curtail transactions or preserve reliability for most of the state by imposing rolling blackouts.

According to Frank Wolak, an economist at Stanford University quoted in the Sacramento Bee, despite what he termed "just standard trading strategies," the ability of generators to withhold power from the grid could cause more serious reliability problems as well as spiraling prices.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service