News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Summer Reserves for California Adequate
LCG, June 10, 2002--The California Independent System Operator reports that it has had less power than needed to achieve a 15 percent reserve margin, but so far, the margin of 7 percent has been adequate to stave off rolling blackouts.In order to be at 7 percent or above, the ISO had to ask some generators to put off scheduled maintenance last week until after periods of elevated air-conditioning demand passed.Some conservation that started with the onset of the 2000 power crisis seems more or less permanent, but some financial incentives have also been provided. A vote by the Legislature renewed the 20/20 program, which gives a 20% refund to households that keep usage 20% below their consumption of power in the 2000 summer season. Conservation may help, but according to the ISO, 1,500 new megawatts of generation will be needed annually to keep pace with new demand.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|