News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Wind Turbines Going Up In Ontario
LCG, July 12, 2002--A wind farm with a maximum output capacity of 9 megawatts is under construction in Ontario, Canada, approximately 165 miles northwest of Toronto.The expected completion for the Ontario Power Generation-built installation is five months from now. British Energy plc holds a joint interest in Huron Wind with Ontario Power. The five turbines of 1.8 megawatts each were manufactured by Vestas, headquartered in Denmark.The wind farm is close to Bruce Power stations A and B, which are also owned by British Energy. All are found on the shore of Lake Huron.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|