EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Bruce Unit Restart Expected This Month

LCG, August 16, 2002--According to Bruce Power, one of four nuclear generating units in Ontario shut down between 1995 and 1998 is likely to be brought into operation again this month.

Of two groups of units making up the Bruce generation station, Bruce A and Bruce B, only the four Bruce B units, started in 1995 through 1998, have been operating recently. Of these, the 860-megawatt Bruce 6 was taken off line in March for significant maintenance activity. The plant is located between Kincardine and Saugeen Shores, next to Lake Huron, with Toronto approximately 165 miles to the southeast.

No mention was made about which of the 825-megawatt units might be restarted. Bruce Power, which is the majority owner of the plant, is a unit of British Energy plc. Cameco Corp. has a 15 percent ownership stake. Approximately 5 percent is owned by unions whose members work at the plants, the Power Workers' Union and The Society of Energy Professionals.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service