EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Rule Changes Made in Florida Plant Bidding

LCG, Jan. 6, 2003--Florida Power & Light, the regulated utility unit of FPL Group Inc., reacted negatively last Friday to modest changes to the bidding rules that govern how builders of new base-loaded power plants are selected in Florida.

A group of independent power producers which has complained that the winning bids have always been one of the state's major utilities was pleased with the moves by the Florida Public Service Commission. The requirement that bidding take place was instated in 1994.

Members of the Partnership for Affordable Competitive Energy (PACE) had been aiming at having an "independent evaluator" monitor bidding, to ensure fairness. Instead, the Commission allowed that the utilities (the other utility, Florida Power, was just re-branded under parent Progress Energy) would have to reconsider others' bids any time their own bid's cost structure was changed. PACE members, among which are Calpine, Mirant, and PG&E Corp., felt that this would make the process more open.

FPL spokesman Mike Swank contended that "The changes have the potential for substantially lengthening the bid rule process." Swank said that the utility would attempt to have the new rules undone.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service