EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

FERC Approves Most of PJM's Proposed Rules for ITCs

LCG, March 18, 2003-FERC agreed with most of the rules proposed by PJM Interconnection regarding the establishment of independent transmission companies.

PJM Interconnection, a non-stock transmission operator in the Mid-Atlantic states, gave the Federal Energy Regulatory Commission a list of proposed standards for potential independent transmission companies (ITC) within PJM's service area. Some consumer protection groups in Ohio, Pennsylvania, and Maryland opposed PJM's proposed standards, asserting that ITC's would have too much autonomy.

FERC found the proposed rules acceptable for the most part but decided that PJM should not yield reliability and planning authority to ITC's.

While FERC would not discuss possible rates to be paid to ITC's, the commission did mention that ITC's are likely to be addressed again when standard market design plans are finalized and released.

FERC released a 32-page order late Friday. In the document FERC limited PJM's region to one tariff, which allows an ITC to have a separate schedule but not its own tariff. PJM will also set the congestion pricing mechanism, while an ITC can by itself apply targeted transmission investment, outage management, and new technologies.

FERC also stated in the order that PJM will remain the regional reliability authority for any ITC and will provide ancillary services outside of scheduling, dispatching, and system control. PJM will also maintain authority over regional planning and will be able to prevent maintenance outages if the need arises. Any ITC would be responsible for maintenance and outage scheduling, however, in addition to managing transmission facility configuration.

Members of a coalition including Commonwealth Edison Co. and American Electric Power Co. have been considering joining PJM as an ITC to be called GridCo East.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service