EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Wisconsin Utility Plans Peaking Unit

LCG, Jan. 20, 2002--A 52-megawatt Pratt & Whitney FT8® Twinpac™ peaking generator will be purchased and installed in Kaukauna, Wisconsin in spring 2004, according to Wisconsin Public Power Inc. (WPPI), a utility owned by 37 municipalities.

The president and CEO of WPPI, Roy Thilly, said, "This project will provide a low-cost, reliable and environmentally sound electric generating source needed to meet load growth in our member communities." The FT8 turbine is a variant of the JT8D aircraft engine.

The installation will also allow three older diesel units, which provide about 7 megawatts, to be retired. "We are pleased to be working with WPPI and look forward to providing them with exceptional customer service," Ellen Smith, president of Pratt & Whitney Power Systems, stated.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service