EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

LADWP's Develops Plans for Wind Farm

LCG, Sept. 19, 2003--A wind farm proposed by the Los Angeles Department of Water and Power that would be made up of 80 1.5-megawatt turbines would be the largest such project of its kind to be owned by a municipal utility.

The area over which the farm would be built covers 22,000 acres in Kern County, east of Los Angeles. Discussions have taken place with representatives from two nearby air bases concerning the height of any turbines that might be built. Edwards Air Force Base and the Naval Air Weapons Station, in China Lake, both have flight tests in Kern County and are engaged in some planning efforts with the county's planning department.

The wind farm, which LADWP hopes to build by the spring of 2005, would be linked to the rest of the electric network by a 6-mile transmission line. The director of system planning and projects for LADWP, John Schumann, has responded to concerns expressed by a local Sierra Club chapter about the visual impact of such a wind farm by saying that the developer Wind Turbine Prometheus LLC selected the location. The environmental group would have preferred that modernization be undertaken at wind farms in nearby Tehachapi first.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service