News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Plant Contract Signed on Texas-Based Combined-Cycle
LCG, Oct. 3, 2003--Brazos Electric Power Cooperative, Inc. has awarded a contract for turnkey construction services to Fluor Corporation, which is to conduct engineering preparations as well as all construction and operating services necessary to bring a 620-megawatt combined-cycle plant online by 2006.The Jack County project is expected to provide 400 jobs during construction. Brazos Electric Cooperative, which conducted its analysis with the Rural Utility Service, expects that the gas-fired plant will help to meet growing demand for electricity, and secure reliability for its customers.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|