News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
FERC to Require Reporting When Reliability Standards Not Met
LCG, Dec. 17, 2003--The Federal Energy Regulatory Commission (FERC) intends to require that utilities report instances in which they fail to meet voluntary standards set by the North American Electric Reliability Council.The Chairman of FERC, Pat Wood III, said that as long as the scope of FERC's authority to enforce standards remains in doubt because of the stalled energy legislation in Congress, requiring reporting would be a first step before NERC's voluntary standards could become legally binding. The reporting requirement could become effective before summer, Wood told the agency.In addition to the reporting requirement, for which support has been expressed by other commissioners as an initial step in improving reliability, FERC might undertake audits of utility performance. The audits could be used to verify compliance by individual utilities.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|