News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
NYC Plant Expansion Undergoes Testing
LCG, Jan. 6, 2003--An expansion of the Ravenswood natural gas-fired power plant, a project built by the utility KeySpan, is being tested before shifting to its planned commercial status in March.The 250-megawatt cogeneration unit and the existing plant, which previously was rated at approximately 2,200 megawatts, are located in the borough of Queens. The utility said that the plant was connected to the city's power grid, operated by Consolidated Edison, for two hours.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|