News
LCG, June 4, 2025--Energy Vault Holdings Inc. (Energy Vault) and Jupiter Power (Jupiter) today announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. The initial BESS project, located near Fort Stockton, Texas, was completed in July 2024, with a storage capacity 100 MW/200 MWh. The new BESS project will add another 100 MW/200 MWh of capacity. Construction has commenced, and the project is expected to achieve commercial operations by the end of this summer.
Read more
|
LCG, May 30, 2025--NuScale Power Corporation (NuScale), a leading provider of advanced small modular reactor (SMR) nuclear technology, yesterday announced that it has received design approval from the U.S. Nuclear Regulatory Commission (NRC) for its uprated 77 MW power modules. NuScale states that it remains the only SMR technology company with design approval from the NRC, and the company remains on track for deployment by 2030, with 50- and 77-MW SMR options.
Read more
|
|
|
Industry News
Heat Leads to ISO Alert for California
LCG, May 30, 2003--Power demand in California surpassed forecasts easily on Wednesday, due to high temperatures that required an estimated weather-related 3,800 megawatts over expected load, and another 700 megawatts more because of forecast error and a lack of conservation.The Independent System Operator, which operates the state's power grid, issued a Stage 1 power alert lasting from 3 P.M. to 6 P.M. A Stage 1 emergency is called when generation reserves drop below 7 percent. Power consumers are asked to cut back on use of heavy appliances at such times, although air conditioners were active in both Northern and Southern California.Jim McIntosh, the head of grid operations, was quoted in the Sacramento Bee: "I don't think we saw much of any conservation yesterday." The approaching summer is expected to be warmer than usual, and could be marked by frequent alerts if conservation is minor, or if the demand patterns signal permanent underlying load growth, not just the effects of Wednesday's sudden bout of warm weather.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|