EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

Minnesota Coal Project Receives DOE Grant

LCG, October 28, 2004--The Department of Energy announced that the proposed Mesaba Energy Project, an advanced coal plant estimated to cost $1.18 billion, will receive a $38 million grant. The grant is part of President Bush's 2002 Clean Coal Power Initiative (CCPI) to invest $2 billion over 10 years to advance technologies to help meet the United State's growing electricity demand.

The project will be a 531-MW, integrated gasification combined cycle (IGCC) plant and will be located near Hoyt Lakes, Minnesota. The generation process includes coal gasification, with the gas from the coal passed through a gas turbine to generate electricity. The hot exhaust gas from the turbine heats water to produce steam to power a steam turbine and generate electricity a second time. The plant design is intended to reduce costs and improve efficiency and availability with reduced emissions. Excelsior Energy Inc. and ConocoPhillips will construct and operate the plant.

Earlier this month, the DOE announced similar grants in support of other advanced coal technology projects. Orlando Utilities Commission (OUC) and Southern Power, the unregulated subsidiary of Southern Company, will receive a $235 million CCPI grant for the development of a 285-MW, advanced coal plant to be built at OUC's existing Stanton Energy Center near Orlando, Florida. Peabody Energy will also receive a $19.7 million CCPI grant to demonstrate a technology to achieve ultra-low emissions at the proposed 300-MW, Mustang Energy Project located near Peabody's Lee Ranch Coal Company operations in New Mexico.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service