EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

In Memory of Rajat Deb: Inspiring Man of Ideas and Remarkable Silicon Valley Archetype

By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.

Read more

Arevon Celebrates Commencement of Operations at the 300-MW Nighthawk Energy Storage Project in California

LCG, August 12, 2026--Arevon Energy, Inc., an energy developer, owner, and operator, today announced that its 300 MW/1,200 MWh Nighthawk Energy Storage Project in Poway, California, is now operational. Arevon celebrated the project's completion with an on-site ribbon-cutting ceremony attended by project partners, local officials, and others who helped bring the project online. Nighthawk, the largest standalone storage facility in the company's portfolio, should enhance system reliability and is among the San Diego region's most significant energy storage facilities.

Read more

Industry News

Genesee 3 Coal Unit Achieves Commercial Operations

LCG, March 2, 2005--EPCOR Utilities Inc. and TransAlta Corporation announced that the new, 450-MW Genesee 3 unit is operational effective today. The new unit, G3, employs advanced technologies, including supercritical combustion and emission controls, and is described by its owners as the most advanced coal plant ever built in Canada.

G3 is a joint venture between EPCOR and Transalta. In January 2003, TransAlta acquired a 50 per cent interest in EPCOR's G3 project. TransAlta's share of the project is estimated to cost $379 million. EPCOR led the construction and will operate G3 along with the existing units 1 and 2, which are located about 30 miles southwest of Edmonton. The generating station is located adjacent to the fuel source, the Genesee coal mine.

With the supercritical boiler, G3 operates at higher temperatures and steam pressures to achieve a more energy efficient process with lower emissions as well. The unit is capable of operating with a minimum net output of 176 MW.

Last December, Transalta announced that it would amend its plans to contruct the 900-MW, Centennial coal plant with a smaller, 450-MW plant that is based upon the supercritical design used for G3. The estimated cost for the revised Centennial 1 project, located about 40 miles west of Edmonton at its Keephills facility, is $750 million.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service