|
News
|
LCG, April 30, 2026--OG&E, the operating subsidiary of OGE Energy Corp., announced today that it will power three new data centers that Google announced in Muskogee and Stillwater, Oklahoma last year. As part of the agreement, Google will also make power generation capacity available from two solar facilities in Stephens and Muskogee Counties that are currently under construction. The data centers and associated Electric Service Agreements are expected to provide economic growth for local communities and the state, contribute to grid stability, and benefit OG&E's current customers.
Read more
|
|
LCG, April 29, 2026--Graphic Packaging Holding Company today announced a virtual power purchase agreement (VPPA) with NextEra Energy Resources, LLC. With the VPPA agreement, NextEra Energy Resources plans to build the Selenite Springs Energy Center, a 250-MW solar energy facility in West Texas, and Graphic Packaging will be the sole buyer of the facility's renewable energy attribute certificates. Graphic Packaging, a global provider of sustainable consumer packaging, expects the agreement to cover approximately 43 percent of its 2025 electricity usage in the U.S. and Canada. The agreement will advance Graphic Packaging's commitment to source renewable electricity and reduce its greenhouse gas (GHG) emissions.
Read more
|
|
|
Industry News
Stirling Energy Systems Add Major Solar Project in California
LCG, September 8, 2005--Arizona-based Stirling Energy Systems (SES) announced yesterday that San Diego Gas and Electric Company (SDG&E) has contracted to purchase between 300 and 900 MW of solar energy from a large-scale, solar project to be located in Southern California's Imperial Valley.The solar power plant will include 12,000 Stirling solar dishes distributed over three square miles. The dish technology tracks the sun and reflects the sun's energy onto the receiver of a Stirling engine, where the energy heats and expands hydrogen gas. The expanding gas drives a piston, crankshaft and drive shaft assembly (without igniting the gas), which in turn drives a generator.SES has six dishes operating at the National Solar Thermal Test Facilities at Sandia National Laboratories in New Mexico. The dishes at the Sandia test facility can operate at nearly a 30 percent peak efficiency while delivering grid-ready alternating current.SDG&E will purchase all of the output over the initial, 20-year term of the agreement. SES has options on two expansion phases that would increase the capacity up to 900 MW.This is the second major project announced recently by SES. In August, SES announced the execution of a 20-year contract with Southern California Edison to purchase 500 to 850 MW of solar power. The project site is in the Mojave Desert near Victorville, California. The initial, 500-MW phase is planned to include a 20,000 dish array, with a construction period estimated to require four years. Both contracts are subject to approval by the California Public Utilities Commission.The State of California's Renewables Portfolio Standard (RPS) Program requires each utility, such as SDG&E and Southern California Edison, to increase its procurement of eligible renewable generating resources by 1% of load per year to achieve a 20% renewables goal. The RPS Program was passed by the Legislature and is managed by California's Public Utilities Commission and Energy Commission.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|