EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

NRC Renews Operating Licenses for Progress Energy's Brunswick Nuclear Units

LCG, June 28, 2006--The Nuclear Regulatory Commission (NRC) announced on June 26, 2006 that it has renewed the operating licenses for Progress Energy's Units 1 and 2 at the Brunswick Nuclear Plant, located south of Wilmington, North Carolina, at the mouth of the Cape Fear River. The renewal adds 20 years to the operating licenses, and the operating lives of Units 1 and 2 will now extend to September 8, 2036, and December 27, 2034, respectively. With the license renewals for Units 1 and 2, the NRC has now renewed a total of 44 nuclear reactor units.

The license renewal application was submitted on October 18, 2004. The NRC concluded that were no environmental impacts that would preclude renewal of the licenses for environmental reasons. The staff's review of the plant safety systems determined that there were no safety concerns that would preclude license renewal, as the licensee had demonstrated effectively the capability to manage the effects of plant aging. In addition, the Advisory Committee on Reactor Safeguards, which is an independent body of technical experts which advises the NRC, issued its recommendation that the operating licenses for Brunswick be renewed.

The two nuclear units at Brunswick Nuclear Plant have a combined electric generating capacity of 1,875 MW. An additional 244 MW of capacity was added to the plant's output from 2002 to 2005 as part of an extended power uprate program that upgraded much of the plant's equipment. The plant is owned jointly by Progress Energy (81.67 percent) and the North Carolina Eastern Municipal Power Agency (18.33 percent).

The operating license extension provides a significant block of future, emission-free power to meet the growing electric load in the Southeast.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service