News
LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.
Read more
|
LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.
Read more
|
|
|
Industry News
Duke Files for New IGCC Project in Indiana
LCG, September 8, 2006--Duke Energy Indiana and Vectren Energy Delivery of Indiana have filed an application for "Certificates of Public Convenience and Necessity" (CPCN) with the Indiana Utility Regulatory Commission to build a coal-fired, electric generating station that would employ an integrated gasification combined cycle (IGCC) design.
The proposed project would have a capacity of approximately 630 MW and would be built at Duke'sexisting Edwardsport generating station near Vincennes, Indiana. Once the new plant is operational, the old facilities, which include coal and oil units that have a capacity of 160-MW, would be retired.
The IGCC design includes coal gasification, with the gas created from the coal passed through a gas turbine to generate electricity. The hot exhaust gas from the turbine heats water to produce steam to power a steam turbine and generate electricity a second time. The gasification process offers the potential for lower cost solutions to capture and sequester CO2.
Duke and Vectren have commissioned GE Energy and Bechtel Corporation to develop an engineering and design study for the plant, which is expected to be completed by the second quarter of 2007. Given favorable plant economics and regulatory review, construction could commence as early as mid-2007.
The application with the Commission is another positive step forward for this project. In September of last year, Cinergy - which was acquired by Duke - announced that it would start the preliminary engineering and design of an IGCC generating station in partnership with Vectren Corporation and that they planned to use GE Energy and Bechtel Corporation for the preliminary engineering study.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|