EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Energy Vault and Jupiter Power Announce New Agreement for Battery Energy Storage System in Texas

LCG, June 4, 2025--Energy Vault Holdings Inc. (Energy Vault) and Jupiter Power (Jupiter) today announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. The initial BESS project, located near Fort Stockton, Texas, was completed in July 2024, with a storage capacity 100 MW/200 MWh. The new BESS project will add another 100 MW/200 MWh of capacity. Construction has commenced, and the project is expected to achieve commercial operations by the end of this summer.

Read more

NuScale Power Achieves Standard Design Approval from NRC for 77 MW SMR

LCG, May 30, 2025--NuScale Power Corporation (NuScale), a leading provider of advanced small modular reactor (SMR) nuclear technology, yesterday announced that it has received design approval from the U.S. Nuclear Regulatory Commission (NRC) for its uprated 77 MW power modules. NuScale states that it remains the only SMR technology company with design approval from the NRC, and the company remains on track for deployment by 2030, with 50- and 77-MW SMR options.

Read more

Industry News

Dominion and Shell WindEnergy Add Second Phase to West Virginia Wind Project

LCG, August 1, 2007--Dominion and Shell WindEnergy, Inc. announced yesterday that a second phase will be added to a large wind farm currently under development in Grant County, West Virginia. The combined phases of the wind project would provide an electric generating capacity of 264 MW.

The initial phase of the wind project includes 82 turbines with a total electric generating capacity of 164 MW. Construction is underway, with commercial operations scheduled for late this year. The new, second phase will consist of 50 turbines with a combined capacity of 100 MW. Given timely receipt of permits, the second phase will commence operations in 2008.

The wind farm is located near Dominion's Mount Storm Power Station. A new 500 kV electric transmission line proposed by Dominion to increase supply and reliability in the region would enhance power flows from the new wind farm to growing loads in the area.

Earlier this month, Dominion Virginia Power, a subsidiary of Dominion, announced plans to increase the use of renewable generation. Plans include a goal of relying on renewable resources for 12 percent of its electricity by 2022, which is consistent with legislation adopted earlier this year by the Virginia General Assembly.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service