News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
Construction Begins on Silver Star Wind Project in Texas
LCG, September 13, 2007--Construction commenced yesterday on the Silver Star Project in west central Texas. The 60-MW wind farm will include twenty-four, 2.5 MW Liberty Wind Turbines are manufactured by Clipper Windpower in Cedar Rapids, Iowa. Clipper will own 15% of the project, and BP Alternative Energy will own 85%. The project is scheduled to begin commercial operations in early 2008. The Silver Star Project is being built in Eastland and Erath Counties and will dispersed over a 54,000 acre site. According to the developers, the footprint of the project facilities will use less than one the percent of the total area, which will continue to be used for ranching.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|