|
News
|
LCG, April 30, 2026--OG&E, the operating subsidiary of OGE Energy Corp., announced today that it will power three new data centers that Google announced in Muskogee and Stillwater, Oklahoma last year. As part of the agreement, Google will also make power generation capacity available from two solar facilities in Stephens and Muskogee Counties that are currently under construction. The data centers and associated Electric Service Agreements are expected to provide economic growth for local communities and the state, contribute to grid stability, and benefit OG&E's current customers.
Read more
|
|
LCG, April 29, 2026--Graphic Packaging Holding Company today announced a virtual power purchase agreement (VPPA) with NextEra Energy Resources, LLC. With the VPPA agreement, NextEra Energy Resources plans to build the Selenite Springs Energy Center, a 250-MW solar energy facility in West Texas, and Graphic Packaging will be the sole buyer of the facility's renewable energy attribute certificates. Graphic Packaging, a global provider of sustainable consumer packaging, expects the agreement to cover approximately 43 percent of its 2025 electricity usage in the U.S. and Canada. The agreement will advance Graphic Packaging's commitment to source renewable electricity and reduce its greenhouse gas (GHG) emissions.
Read more
|
|
|
Industry News
Clipper Windpower Plans Development of 7.5 MW Wind Turbine for Offshore Sites
LCG, October 10, 2007--Clipper Windpower announced Monday that it will develop an offshore wind turbine with a generating capacity of 7.5 MW. The new wind turbine will be the largest in the world and will be a significant step up from Clipper's Liberty wind turbine, which has a capacity of 2.5 MW.
Known as the "Britannia Project," Clipper created a Centre of Excellence for Offshore Wind in Blyth, United Kingdom. The project will utilize the Blyth-based New and Renewable Energy Centre (NaREC) and its engineering and test laboratory. NaREC was founded in 2002 as a Centre for Excellence for research and development of renewable energy technologies designed to address climate change concerns.
According to Clipper, engineering for the project will be shared between Clipper's Advanced Technology Group, based in Carpinteria, California, and Clipper operations in Blyth. One NorthEast, the Regional Development Agency for the North East of England, will provide funding to support the project. Clipper currently manufactures its 2.5-MW Liberty wind turbine at its assembly facility located in Cedar Rapids, Iowa.
Currently, the largest wind turbine is a 6 MW turbine manufactured by ENERCON. Two of these E-126 6 MW models are being installed in Emden, Germany. The towers will be 131 meters tall and include 36 concrete segments, and the total height will be 198 meters - roughly the length of two soccer fields or slightly taller than the Washington Monument.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|