EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Avangrid and Puget Sound Energy Sign PPA, Including Upgrade and Life Extension, for Washington Wind Project

LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.

Read more

DOE Acts to Ensure Key Coal-fired Power Plants Are Available in MISO to Supply Peak Summer Demands

LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.

Read more

Industry News

PG&E Executes Agreement for Solar Power from 177-MW Thermal Plant

LCG, November 6, 2007--Pacific Gas and Electric Company (PG&E) yesterday announced a power purchase agreement with Ausra, Inc. for the electric output from a 177-MW solar thermal power project proposed in central California in San Luis Obispo County. The project is planned to be operational in 2010.

The project will incorporate Ausra's Compact Linear Fresnel Reflector (CLFR) solar technology designed to use the sun's energy to boil water at high temperatures to power steam turbine generators, similar to traditional fossil-fuel power plants - but without air or water emissions. According to Ausra, a CLFR collector reflects and concentrates sunlight on an elevated absorber to roughly 30 times the intensity of sunshine at the earth?s surface.

The solar collector footprint for the project will require about one square mile (640 acres) of land. Ausra filed an Application for Certification for this plant with the California Energy Commission, from which approval is required prior to construction.

California passed a Renewable Portfolio Standard (RPS) Program that requires utilities to increase their electric supply procurement of eligible renewable generating resources by one percent of load per year, with a 20 percent renewables target by the end of 2010 and a 33 percent target by the end of 2020.

Ausra is a privately held, California-based company funded by Khosla Ventures and Kleiner, Perkins, Caufield & Byers.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service