EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

UniStar Submits Application to Build Nuclear Reactor

LCG, November 16, 2007--UniStar Nuclear Energy, a joint venture between Constellation Energy and The EDF Group, yesterday submitted an application to the Maryland Public Service Commission (PSC) for a Certificate of Public Convenience and Necessity (CPCN) to construct a 1,600-MW nuclear reactor at Constellation Energy's existing Calvert Cliffs Nuclear Power Plant in Lusby, Maryland. Unistar anticipates a PSC decision by the end of next year.

Unistar filed in July with the Nuclear Regulatory Commission (NRC) the environmental report portion of a combined construction and operating license (COL) application to build the reactor. Unistar plans to submit the remainder of the application by March 2008.

Unistar Nuclear's application will include AREVA's 1,600-MW, U.S. Evolutionary Power Reactor (US EPR). The US EPR is based upon AREVA's 1,600-MW, European EPR that is now being deployed in Europe. One EPR reactor is currently under construction in Finland. AREVA completed phase one of its U.S. EPR Design Certification pre-application process with the NRC. AREVA expects that the Design Certification application will be validated by 2010, which would enable a U.S. EPR to be licensed and ready for operation as early as 2015.

Unistar has not made a final decision to build this new advanced-design reactor at Calvert Cliffs. According to Constellation, the ultimate decision to build will not be made until the overall economics and risks associated with the project are better defined, including the availability and cost of federal loan guarantees, and state and local fiscal policies that affect the tax treatment of the proposed plant.

Unistar is also considering the installation of another nuclear reactor at Constellation Energy's Nine Mile Point nuclear facility in upstate New York.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service