|
News
|
LCG, October 6, 2026--Google and Constellation Energy today announced a long-term strategic clean energy collaboration to bring 890 MW of new, reliable, carbon-free nuclear capacity onto the PJM Interconnection grid to meet growing demand and increase grid reliability. The first uprate is expected to be delivered by 2028.
Read more
|
|
LCG, October 5, 2026--The U.S. Department of Energy’s (DOE) Office of Energy Dominance Financing (EDF) today announced a conditional loan commitment of up to $4.2 billion to finance nuclear uprates and modernization across Vistra’s nuclear fleet in Pennsylvania and Ohio. The projects are expected to preserve nearly 4 GW of carbon-free, baseload power and add 433 MW of new nuclear capacity that will support the growing electricity demand across the PJM region.
Read more
|
|
|
Industry News
Georgia EPD Issues Draft Permits for Proposed Coal-fired Power Plant in Georgia
LCG, August 26, 2009--POWER4Georgians, a coalition of Georgia electric membership cooperatives (EMCs), announced yesterday that the Georgia Environmental Protection Division (EPD) issued draft permits for their proposed coal-fired, power plant in Georgia. The Georgia EPD issued drafts of the air permit, the surface water withdrawal permit, the groundwater withdrawal permit, and the water discharge permit.
The proposed power station, Plant Washington, would be an 850-MW, electric generating station located on a 1,600-acre site in Washington County, Georgia. The project incorporates supercritical technology to improve efficiency and better enable reduced emissions.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|