EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Avangrid and Puget Sound Energy Sign PPA, Including Upgrade and Life Extension, for Washington Wind Project

LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.

Read more

DOE Acts to Ensure Key Coal-fired Power Plants Are Available in MISO to Supply Peak Summer Demands

LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.

Read more

Press Release

Energy Storage - New Study Explores the Efficacy of Storage in Integrating Wind in Regional Electric Systems



LCG, August 2, 2010 – The Electric Power Research Institute (EPRI) and LCG Consulting jointly conduct a multi-region study to find out how energy storage can help in meeting Renewable Portfolio Standards (RPS) by providing an efficient means for integrating wind turbines to the electric systems.

The study contributes to better understanding of the physical and financial implications of expansion of wind generation. According to Dan Rastler, the EPRI Project Manager, “The project will focus on realistic market valuation of energy storage technologies with increasing renewable generation at different locations throughout the United States, across a range of future contingencies considering energy prices, fuel use, emissions and investment in new capacity.”

Results from the demonstrative study for ERCOT indicate that storage has definite beneficial role in smoothing the fluctuation in wind availability. The results also confirm the usefulness of storage in congestion management, and in deferring capacity investment. The study was conducted using LCG’s UPLAN Network Power Model and PLATO database for ERCOT.
In view of the encouraging findings in ERCOT, EPRI has decided to extend the scope of the study to other regions of the U.S. including New York ISO (NYISO), PJM, California and Midwest ISO (MISO). It also envisions the new study will cover several storage technologies such as Compressed Air Energy Storage (CAES), bulk and distributed battery storage, liquid air energy storage (LAES), flywheel and other fast response storage devices.
“The study will look into the issue of gaining adequate transmission access to load centers, by optimal use of existing transmission and as well as by identifying appropriate new transmission investments”, says Srinivas Jampani, LCG’s lead consultant.

About LCG Consulting:
With more than 25 years of experience, LCG Consulting is a pioneer and market leader in modeling the competitive energy market. LCG offers a full range of consulting services and specialized software products including the UPLAN Network Power Model and regional PLATO databases which are widely adopted for simulating electric systems.

Contact: Sidart Deb
LCG Consulting
650-962-9670
http://www.energyonline.com

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service