EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

SaskPower Receives Approval for Carbon Capture Project

LCG, April 28, 2011--The Government of Saskatchewan approved construction of the C$1.24 billion Boundary Dam Integrated Carbon Capture and Storage (CCS) Demonstration Project, which is expected to capture approximately one million tonnes per year of carbon dioxide (CO2). Construction is scheduled to commence shortly, with operations to begin in 2014.

Rob Norris, minister responsible for SaskPower, stated, "This project will forge an environmentally sustainable path for the production of coal-fired electricity in Saskatchewan. By proceeding with the carbon capture project at Boundary Dam, while continuing to add wind power and investigating other renewable energy options such as biomass, SaskPower is helping to build a greener future for Saskatchewan."

The existing Boundary Dam Power Station, located near Estevan, is SaskPower's largest power generating facility and includes six, coal-fired units, with a total plant generating capacity of 824 MW. Unit 3 will be rebuilt to incorporate a carbon capture process that will reduce capacity from about 139 MW to 110 MW, given expected energy loads for the carbon capture process. Cansolv, a wholly owned subsidiary of Shell Global Solutions, will supply the carbon capture process, and Hitachi will supply the steam turbine.

SaskPower is pursuing the sale of the captured CO2 for enhanced oil recovery (EOR) projects, and captured sulphur dioxide may be sold for use in the manufacture of sulfuric acid.

The Boundary Dam Integrated CCS Demonstration Project has received C$240 million from the federal government, of which about C$180 million has been spent.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service