News
LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.
Read more
|
LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.
Read more
|
|
|
Industry News
AES Announces New Battery Storage Project for PJM
LCG, June 19, 2013--AES Energy Storage, a subsidiary of AES Corporation, yesterday announced plans to deliver 40 MW of new, advanced energy storage resources to the PJM Interconnection. The new storage capacity will be located at Dayton Power and Light's (DP&L) Tait Generating Station, south of Dayton, Ohio. The storage resource can displace power generation from aging, inefficient power plants and potentially reduce overall system emissions. The project is expected to be operational in September 2013.
The AES storage resource is a battery array designed to provide frequency regulation service to the PJM market and deliver a new energy technology to Ohio. The 40 MW storage resource will consist of 24 MW from AES inventory plus 16 MW from an existing AES facility that will be relocated to Ohio.
The President of AES Energy Storage stated, "We've designed our business model in a way that allows us to quickly evaluate and respond to changing market needs. We can make decisions on where we locate battery storage to optimize service across markets. Physically moving an asset to where it?s needed most hasn't been possible with traditional power generation and load resources, so it's exciting to be able to do this with energy storage assets."
DP&L's Tait Station is a peaking facility. The storage project will connect through the station and will utilize an independent agreement with PJM.
AES recently surpassed 400,000 MWH of service within PJM at its Laurel Mountain facility, which also utilizes AES' patented control system designed to most efficiently control the battery array consistent with the local market dispatch rules.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|