EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PUC of Texas Approves Entergy Texas' Plans to Build Over 1,200 MW of Gas-Fired Capacity

LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.

Read more

Puget Sound Energy Starts Construction on 142-MW Appaloosa Solar Project in Washington

LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.

Read more

Industry News

NRC Announces Hearing Opportunity for License Renewal of Exelon's Byron and Braidwood Nuclear Stations

LCG, July 25, 2013--The Nuclear Regulatory Commission (NRC) announced yesterday the opportunity to request an adjudicatory hearing on Exelon Generation Company's application to renew the operating licenses of the Byron and Braidwood nuclear power plants, which are located in Illinois. If the licenses are extended, nearly 2,700 MW of non-carbon emitting generating capacity will survive for another 20 years.

Exelon filed the application on May 29, and the NRC staff has determined the application is sufficiently complete to allow the staff to formally docket the application and commence its technical and environmental reviews.

Exelon filed the application to renew and extend the operating licenses for an additional 20 years of operation. The current operating licenses for Braidwood expire on October 17, 2026, for Unit 1 and December 18, 2027, for Unit 2; the licenses for Byron expire October 31, 2024, for Unit 1 and November 6, 2026, for Unit 2.

The Braidwood Nuclear Station, with a capacity of 2,360 MW, is Exelon's newest nuclear power plant and is located about 60 miles southwest of Chicago. The Byron Nuclear Station is located about 110 miles west of Chicago and has a net generating capacity of 2,336 MW.

Both stations include two pressurized-water reactors.

Exelon submitted a single application to cover both plants due to the similarities in the systems, structures and components of each that are analyzed in a license renewal review.

The NRC stated that requests for a hearing on the application must be filed by September 23.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service