EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DOE Announces Site Selection for Energy Infrastructure and AI Data Centers on Federal Lands

LCG, July 24, 2025--The U.S. Department of Energy (DOE) today announced the next steps in the Trump administration’s plan to accelerate the development of AI infrastructure by using Federal lands to lower energy costs and help power the global AI race, as previously outlined in President Trump’s Executive Orders on Accelerating Federal Permitting of Data Center Infrastructure, Deploying Advanced Nuclear Reactor Technologies for National Security, and Unleashing American Energy.

Read more

Enbridge Announces 600-MW Solar Project in Texas to Power Meta Data Center Operations

LCG, July 22, 2025--Enbridge Inc. (Enbridge) today announced that it has reached a final investment decision on the Clear Fork solar project located near San Antonio, Texas. Meta Platforms, Inc. (Meta), has signed a long-term contract for all of the renewable power generated from the 600-MW project.

Read more

Industry News

DTE Energy Receives License from NRC for New Reactor at Fermi Plant

LCG, June 12, 2015-The Nuclear Regulatory Commission (NRC) recently approved the license to construct and operate Fermi Unit 3 at DTE Energy's existing nuclear plant near Newport, Michigan, where the 1,170-MW Fermi Unit 2 has been operating since 1988.

Fermi Unit 3 is the fifth new reactor to complete the NRC's combined license (COL) process. DTE Energy has not committed to building the new reactor and is keeping the option open for long-term planning purposes.

GE-Hitachi Nuclear Energy is the reactor vendor for Fermi Unit 3, and the reactor type is an Economic Simplified Boiling-Water Reactor (ESBWR). The NRC certified the ESBWR design in October 2014. The ESBWR is a single-cycle, boiling-water reactor (BWR). The containment vessel is a cylindrical steel-lined reinforced concrete structure integrated with the reactor building. Based on the reference design, the plant operates at a net estimated electrical power output of approximately 1,535 MW.

DTE Energy submitted its COL application to the NRC in September, 2008.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service