News
LCG, September 12, 2025--Entergy announced yesterday that the Public Utility Commission of Texas (PUCT) approved Entergy Texas’ proposal to build two efficient natural gas-fired power plants to support the region’s rapid growth. The combined electric generating capacity of the two facilities, the Legend Power Station and the Lone Star Power Station, will add over 1,200 MW to the Southeast Texas power grid to support new customer demand, increase reliability and lower costs for all customers. Both facilities are scheduled to commence operations by mid-2028.
Read more
|
LCG, September 4, 2025--Puget Sound Energy (PSE) announced yesterday that phased construction has commenced on its 142-MW Appaloosa Solar Project, a utility-scale solar facility underway in southeastern Washington. The project is being built by Qcells EPC, who will serve as the module manufacturer and the engineering, procurement, and construction (EPC) solution provider. Construction is scheduled through 2026, and commercial operation is expected at the end of next year.
Read more
|
|
|
Industry News
Congestion in the Texas Panhandle: LCG Consulting investigates ERCOT’s rapid wind development and Lubbock Power & Light joining the ERCOT grid
LCG, May 10, 2016--LCG Consulting has released a new study of wind energy development in the Panhandle Renewable Energy Zone, or PREZ, of Texas, where ERCOT has proposed significant changes in the infrastructure to enable sustained wind development and ensure stability of the grid. LCG’s study, ERCOT Panhandle Renewable Energy Zone and Lubbock Power & Light Integration, looks at how these changes affect power flow and locational marginal prices under various scenarios and transmission upgrade options. It outlines infrastructure challenges, current developments in wind curtailment due to Panhandle congestion, and it provides an outlook for wind generation in the region. Analysis was conducted using the UPLAN Network Power Model which replicates ERCOT ISO protocols and market procedures.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|